Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Bazhou Tengfei Electric Power Tools General Factory

Pipe jacking machine, cable conveyor, pole erection machine, motorized winch,...

sell
  • There is no classification
contact
  • Contact:刘经理
  • Phone:0316-5661993
  • Email:1952217629@qq.com
  • fax:0316-7393526
search
 
link
  • There is no link yet
home > sell > Cable pulling machine, cable laying machine price, cable conveyor
Cable pulling machine, cable laying machine price, cable conveyor
products: Views:6Cable pulling machine, cable laying machine price, cable conveyor 
brand: 腾飞
price: 1.00元/1
MOQ: 1 1
Total supply: 1000 1
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-05-15 12:52
 
Details
Cable conveyor, cable laying machine, cable laying machine, cable traction machine Description The deceleration mechanism of the cable conveyor is reasonable, the speed is stable and the traction force is constant, and an intelligent control device can be installed to achieve digital control of constant speed and constant torque.
Construction application of three-cable conveyor
The cable conveyor is driven by a motor and two pairs of highly elastic, tough and wear-resistant rubber tapered drive wheels. The cables are pressed into the rubber drive wheels by two rubber pulleys and pushed up and down. Cable friction coefficient
Small conveying force and large force will not cause any damage to the cable. The gap of the tapered driving wheel is adjustable and is suitable for cables with diameters ranging from 1 to 1. After the cable is laid, the height of the machine is only 1. It is also very convenient to take out the cable from the machine without causing the cable to bend. The cable conveyor can be operated individually. Each machine has a built-in sub-control box to provide power for single control operation. The cable conveyor can be operated forward or backward. It is suitable for adjusting the length of the cable after cable laying. It can also be grouped for simultaneous operation and group control for each operation. The group needs to be equipped with a master control box.
According to the model and specification of the cable to be laid, the path length, the starting point, the end point, and the on-site survey to determine the position of the scaffolding used by the cable laying personnel and the form of the scaffolding to determine the cable
The location of the panel placement, the location of the power box, and the number and length of the power cables. The number of cable pulleys, the number of cable pulleys required to place and fix the cable pulleys, the manpower required to arrange them, and other auxiliary equipment such as walkie-talkies, etc.
Draw a construction plan according to the construction plan, indicate the location of the cable conveyor, the distance between the conveyors (the distance along the cable path, the location of the conveyor power supply, the placement of the cable tray
The distribution of the cable pulleys for each The model of the cable pulley, the location of the power box, the direction of the power cable, etc.
Request for quotation
A total of0articles  Related Comments: